国内揄拍国内精品人妻-久久久亚洲一区二区三区-欧洲美熟女乱又伦av影片-日本熟妇乱人伦a片免费高清-天堂va在线高清一区

中文English
中文English

Daily maintenance and upkeep of a four pillar car lift

Column:Lift knowledge Time:2024-11-14
The daily maintenance of a four column car lift mainly includes the following aspects: checking fasteners, checking hydraulic systems,

The daily maintenance of a four pillar car lift mainly includes the following aspects:

Check fasteners:

Before use, check whether the steel wire rope, locking rod and other fasteners are safe and secure.

Regularly check whether all screws are loose and tighten them in a timely manner.

Check the hydraulic system:

Before use, check if the hydraulic oil is sufficient (generally 9L is required).

Regularly check the hydraulic oil level and replenish it promptly if any deficiencies are found.

Check the hydraulic pipeline for wear or oil leakage, and replace it if necessary.

Check the lubrication condition:

Apply ZG-3 grease to the steel wire rope pulley once every quarter.

Apply an appropriate amount of ZG-3 grease to the steel wire rope every month.

Check the lubrication condition of the guide rail, lubricate if necessary, and check if the guide rail rubber block is damaged.

Check all connecting mechanisms and transmission systems, and lubricate them.

Check safety devices:

Before use, ensure that the self-locking plate can enter the locking square hole normally, and manual safety must be fully inserted into the locking square hole before use.

Remove surrounding obstacles before lifting, and no one should stand on either side or below.

Pay attention to whether the left and right safety teeth are completely disengaged when descending, and closely observe whether the left and right are synchronized.

Check all rotating shafts and add oil to the oil pot every week to ensure smooth rotation.

Check the wear, interference, and damage of moving parts, and ensure that the insurance is working properly.

Check other components:

Check all pipeline joints, bolts, and pins to ensure good connection status, and clean the dust on the sliding parts of the lift.

Check if the exposed cables are intact and if the equipment buttons and switches are functioning properly.

Precautions for use:

When the equipment is not used for a long time or overnight, it should be lowered to the lowest position and driven away, then the power should be cut off.

If the main and auxiliary platforms are found to be unbalanced, they should be immediately stopped from use and can only work normally after being leveled again.

Record and maintenance cycle:

Regular maintenance should be carried out, specifically daily maintenance every week, weekly maintenance every month, and monthly maintenance every year, and the maintenance date and content should be recorded.

Through the above maintenance content, the normal operation and safe use of the four pillar car lift can be ensured. It is recommended to conduct regular inspections and maintenance according to the above content to extend the service life of the equipment and ensure the safety of operation.


主站蜘蛛池模板: 不卡无码av一区二区三区| 国产精品久久国产精品99盘| 夜夜爱夜鲁夜鲁很鲁| 国产精品视频熟女韵味| 99视频偷窥在线精品国自产拍 | 久久久久亚洲精品无码蜜桃| 国产精品aⅴ免费视频| 麻豆果冻传媒精品一区| 在线看片免费人成视频在线影院| 四虎国产精品免费久久| av永久天堂一区| 超碰伊人久久大香线蕉综合| 国产精品va无码免费麻豆| 久久国产精品免费一区下载| 欧美日本日韩| 女人与公人强伦姧人妻完电影| 无码视频免费一区二三区| 亚洲精品乱码一区二区三区| 亚洲另类春色校园小说| 国产免费看又黄又大又污的胸| 成人免费无码大片a毛片| 亚洲精品久久久久久| 国产精品自产拍在线18禁| 久人人爽人人爽人人片av| 欧美日韩精品久久久免费观看 | 无码精品人妻一区二区三区免费看| 久久这里只精品热在线18| 麻豆国产va免费精品高清在线| 被窝的午夜无码福利专区| 非洲黑人最猛性xxxx交| 久久中文字幕人妻丝袜| 日日碰狠狠躁久久躁综合网| 男女啪啪抽搐呻吟高潮动态图| 精品一区二区国产在线观看 | 日欧137片内射在线视频播放| 亚洲啪啪av无码片| 天堂av无码大芭蕉伊人av不卡| 欧美精品v欧洲精品| 久热这里只精品99国产6-99re视…| 一本一道av无码中文字幕﹣百度| 国产三级精品三级在线专区1|